Price Rewind: 2019 Prices for a Limited Time + Save Up to $300 in Early Registration Discounts! *Restrictions apply.

  • University
  • Corporate
    • Go to my cart
  • Login
School of PE LogoSchool of PE Logo White
  • Go to my cart
  • Clear my cart
  • Engineering
    • FE
    • PE
    • Surveying
    • University Students

    FE

    • FE Civil
    • FE Electrical
    • FE Mechanical
    • FE Other
    • FE Environmental
    • FE Chemical
    • FE Industrial

    PE

    • PE Civil
      • Construction
      • Geotechnical
      • Structural
      • Transportation
      • Water Resources and Environmental
    • CA Civil
      • Seismic
      • Surveying
    • PE Mechanical
      • HVAC & Refrigeration
      • Machine Design & Materials
      • Thermal & Fluid Systems
    • PE Electrical & Computer
      • Power
      • Computer
      • Electronics, Controls, & Communications
    • PE Structural (SE Exam)
      • Lateral Forces
      • Vertical Forces
    • All Other PE Courses
      • PE Environmental
      • PE Chemical
      • PE Architectural
      • PE Control Systems
      • PE Industrial
      • PE Petroleum
      • PE Fire Protection

    Surveying

    • Fundamentals of Surveying
    • Principles and Practice of Surveying

    University Students

    • FE Civil
    • FE Electrical
    • FE Mechanical
    • FE Other
    • FE Environmental
    • FE Chemical
    • FE Industrial
  • Project Management
    • PMI Certification
    • Project Management

    PMI Certification

    • PMP®
    • CAPM®
    • PMI-ACP®

    Project Management

    • Fundamentals of Project Management
    • Earned Value Management
  • Architecture
    • ARE® 5.0

    ARE® 5.0

    • ARE® 5.0 Ultimate Bundle
  • Self-Study
  • Question Bank
  • Continuing Education
    • PDHs
    • PDUs
  • More
    • About School of PE
    • Tutoring
    • Testimonials
    • FAQs
    • Contact Us
    • Blog
    • Podcast
  • University
  • Corporate
  • Login
Information
*Discounts and total savings vary by course and schedule. All discounts already shown on site. Offer valid on new registrations only.
Alert

There are no items in your cart

Alert

OK
ATTENTION

NCEES has released updated exam specifications for . These changes are effective with exams beginning on October 1, 2025.

Blog Banner

School of PE Blog

This blog includes a compilation of subject-matter expert-authored articles covering topics within engineering, project management, architecture, and more.

  1. Home
  2. Blog
  3. what are the basics of egress

What Are the Basics of Egress?

Nov 12, 2021

The main goal of safety in a built environment is to get occupants out of a building as quickly as possible in the event of an emergency. Fire protection engineers work to arrange exits in such a way that all occupants can leave safely before they are overcome by heat or smoke.

Table of Contents

    1. Components of Egress
    2. Egress Requirements Change Based on Number of Occupants
    3. Egress Placement and Size Requirements
1. Components of Egress
The way to leave a building is defined as the means of egress, which is a continuous and unobstructed path from inside a building to the public way. The means of egress is split into three distinct parts: exit access, exit, and exit discharge. The exit access is the pathway leading to an exit. An example would be the path between cubicles to get to an exit corridor. The exit provides a protected path to the exit discharge. Corridors and stairwells are common examples of an exit and are often protected by fire walls. The exit discharge connects the exit to the public way. This can be an exterior path leading from the building to the public sidewalk. All three aspects are required for a means of egress to be code compliant.
What Are the Basics of Egress?
2. Egress Requirements Change Based on Number of Occupants
Intuitively, the more people there are in a building, the more exits are required for egress. If there are 49 people or less in a room, only one exit is required. A space containing between 50 and 499 people requires two exits, 500 to 999 occupants require three exits, and an area with over 1000 occupants would require a minimum of four exits. The number of occupants that are allowed to be in a particular area is determined by the occupant load calculation. The occupant load calculation is performed by dividing the area by the occupant load factor, which can be found in the applicable life safety code (NFPA 101, IBC, local codes, etc.).
Using a business occupancy as an example, the occupant load factor according to the IBC is 150 square feet per person, so a 10,000 square foot office space can have a maximum of 66 people (10,000 square feet divided by 150 square feet per person). This also means there must be a minimum of two exits from the space. The square footage per person varies by occupancy type. For instance, a warehouse could have an occupant load factor of 500 square feet per person while an event center could have an occupant load factor of 15 square feet per person. Changes in occupancy are important to recognize because that same 10,000 square foot office space could be converted to an event center, which would increase the occupant load to 666 people (10,000 square feet divided by 15 square feet per person), and an additional exit would be required.
3. Egress Placement and Size Requirements
The locations of the exits must also be considered. Exits cannot be too close together; the exits in a sprinklered building must be separated by at least 1/3 the diagonal distance of a room, and that distance increases to 1/2 diagonal distance in an unsprinklered building. Exits cannot be obstructed or otherwise impeded by furniture or obstacles.
The width of the egress component must also be considered. For instance, two 32-inch doors would not be adequate to serve a concert hall with 400 occupants. Generally speaking, the width of the stairs and ramps can be found by multiplying the number of occupants by 0.3 and the width of the doors and other level components is found using a factor of 0.2. Therefore, the total width of doors required for the 400-person concert hall is 80 inches (400 times 0.2). This can be split between the two doors required, and one of the doors must be a minimum of 32 inches, which allows for passage of wheelchairs.
Fire protection engineers must work with architects to determine the best ways to get people out in an emergency. Although fire suppression and detection systems are important, the goal is to evacuate the building before people are injured or killed. Ultimately, understanding the basics of egress will help save lives.

About the Author: Nick Tran

Nick Tran is a licensed Mechanical and Fire Protection Engineer in California. He has an Associates degree in Computer Aided Design from De Anza College, a Bachelor of Science degree in Mechanical Engineering from San Jose State, and a Master of Science degree in Fire Protection Engineering from Cal Poly SLO. He is currently on the UL Standards Technical Panel for UL 38 and was president of the Alameda County Fire Prevention Officers Association.

Latest Blogs

26 Nov

What Are the Basics of Fire Sprinklers?

19 Nov

What Are the Basics of Fire Alarm Systems?

05 Nov

Why Become a Fire Protection Engineer?

Blogs by Year/ Month

2025 (24)
  • June (2)
  • May (5)
  • April (4)
  • March (4)
  • February (4)
  • January (5)
2024 (52)
  • December (4)
  • November (5)
  • October (4)
  • September (4)
  • August (5)
  • July (4)
  • June (4)
  • May (5)
  • April (4)
  • March (5)
  • February (4)
  • January (4)
2023 (54)
  • December (4)
  • November (5)
  • October (5)
  • September (5)
  • August (5)
  • July (5)
  • June (6)
  • May (4)
  • April (5)
  • March (6)
  • February (3)
  • January (1)
2022 (52)
  • December (5)
  • November (4)
  • October (4)
  • September (5)
  • August (4)
  • July (5)
  • June (4)
  • May (4)
  • April (5)
  • March (4)
  • February (4)
  • January (4)
2021 (63)
  • December (5)
  • November (4)
  • October (4)
  • September (5)
  • August (4)
  • July (4)
  • June (3)
  • May (1)
  • April (8)
  • March (9)
  • February (8)
  • January (8)
2020 (57)
  • November (2)
  • October (4)
  • September (4)
  • August (5)
  • July (4)
  • June (5)
  • May (6)
  • April (9)
  • March (9)
  • February (7)
  • January (2)
2019 (34)
  • December (4)
  • November (7)
  • September (1)
  • August (8)
  • July (5)
  • June (1)
  • May (4)
  • February (1)
  • January (3)
2018 (61)
  • December (4)
  • November (10)
  • October (12)
  • September (12)
  • August (11)
  • July (8)
  • June (1)
  • May (1)
  • March (1)
  • February (1)
2017 (28)
  • August (1)
  • June (4)
  • May (4)
  • April (5)
  • March (5)
  • February (5)
  • January (4)
2016 (41)
  • December (4)
  • November (5)
  • October (6)
  • September (7)
  • August (7)
  • May (1)
  • April (4)
  • March (3)
  • February (1)
  • January (3)
2015 (15)
  • December (3)
  • November (1)
  • September (2)
  • August (3)
  • July (1)
  • June (1)
  • May (1)
  • March (1)
  • February (2)
2014 (3)
  • December (1)
  • November (1)
  • October (1)

We use cookies that are necessary to operate this website and to offer you a better experience. By proceeding, you acknowledge that you accept these cookies. To learn more, visit our Privacy Policy.

Subscribe

Keep up to date with the latest School of PE news and current offers.

  • School of PE Logo White
Our Company
  • About Us
  • Contact Us
Partnerships
  • Become an Affiliate
  • Companies Served
  • Corporate
  • Universities
  • Work with Us
Resources
  • Affirm Financing
  • Blog
  • Corporate Terms and Conditions
  • DMCA
  • Engineer in Training
  • Errata
  • FAQs
  • Pass Guarantee Policy
  • Money-Back Guarantee
  • Podcast
  • Return Policy
  • Site Map
Promotions
  • Discounts
  • University Students

Copyright © 2025 Privacy Policy

Copied to clipboard