Price Rewind: 2019 Prices for a Limited Time + Save Up to $300 in Early Registration Discounts! *Restrictions apply.

  • University
  • Corporate
    • Go to my cart
  • Login
School of PE LogoSchool of PE Logo White
  • Go to my cart
  • Clear my cart
  • Engineering
    • FE
    • PE
    • Surveying
    • University Students

    FE

    • FE Civil
    • FE Electrical
    • FE Mechanical
    • FE Other
    • FE Environmental
    • FE Chemical
    • FE Industrial

    PE

    • PE Civil
      • Construction
      • Geotechnical
      • Structural
      • Transportation
      • Water Resources and Environmental
    • CA Civil
      • Seismic
      • Surveying
    • PE Mechanical
      • HVAC & Refrigeration
      • Machine Design & Materials
      • Thermal & Fluid Systems
    • PE Electrical & Computer
      • Power
      • Computer
      • Electronics, Controls, & Communications
    • PE Structural (SE Exam)
      • Lateral Forces
      • Vertical Forces
    • All Other PE Courses
      • PE Environmental
      • PE Chemical
      • PE Architectural
      • PE Control Systems
      • PE Industrial
      • PE Petroleum
      • PE Fire Protection

    Surveying

    • Fundamentals of Surveying
    • Principles and Practice of Surveying

    University Students

    • FE Civil
    • FE Electrical
    • FE Mechanical
    • FE Other
    • FE Environmental
    • FE Chemical
    • FE Industrial
  • Project Management
    • PMI Certification
    • Project Management

    PMI Certification

    • PMP®
    • CAPM®
    • PMI-ACP®

    Project Management

    • Fundamentals of Project Management
    • Earned Value Management
  • Architecture
    • ARE® 5.0

    ARE® 5.0

    • ARE® 5.0 Ultimate Bundle
  • Self-Study
  • Question Bank
  • Continuing Education
    • PDHs
    • PDUs
  • More
    • About School of PE
    • Tutoring
    • Testimonials
    • FAQs
    • Contact Us
    • Blog
    • Podcast
  • University
  • Corporate
  • Login
Information
*Discounts and total savings vary by course and schedule. All discounts already shown on site. Offer valid on new registrations only.
Alert

There are no items in your cart

Alert

OK
ATTENTION

NCEES has released updated exam specifications for . These changes are effective with exams beginning on October 1, 2025.

Blog Banner

School of PE Blog

This blog includes a compilation of subject-matter expert-authored articles covering topics within engineering, project management, architecture, and more.

  1. Home
  2. Blog
  3. architects role with means and methods

The Architect's Role with Means and Methods

Dec 27, 2019

The activities of the contractor during construction are often referred to as the means and methods.
Scenario: The architect comes to the site for construction observation and notices that there are subcontractors that are working in a dangerous area without protection. The architect tells the subcontractors that they should remedy the situation and tells them how.
What may seem like a situation of common courtesy can actually have dire consequences with the contractual structure of the relationships during a construction project.
Only the contractor is responsible for the means and methods of the construction project, including the safety of those on site. In this scenario, the architect crossed a line. Dangerous situations occur all the time on construction projects, but the architect cannot make that determination or suggest a remedy. That is the sole responsibility of the contractor. The architect, in doing so, assumes risk. The issue is not so much about taking a chance and saying something so people don't get hurt; the issue comes with the correlation of risk and insurance. The architect, contractually, is not required to carry the insurance for the workers on the construction site. That is the responsibility of the contractor. If the architect starts to control the means and methods, he/she assumes that risk. If something goes wrong, the architect does not have the insurance to cover that liability. Therefore, the architect should avoid saying anything that would be misconstrued as controlling the means and methods or giving direction. That does not mean the architect must remain silent. The line is situated between saying something that sounds like giving an order and saying something that sounds like communicating a concern. The architect should be concerned with staying contractually compliant or risks getting into trouble.

Latest Blogs

23 Dec

Architect's Role in the Bidding Process

17 Dec

Integrated Project Delivery

03 Dec

Holy Guacamole: 5 Brain Foods That Will Help You Study for NCEES Exams

Blogs by Year/ Month

2025 (24)
  • June (2)
  • May (5)
  • April (4)
  • March (4)
  • February (4)
  • January (5)
2024 (52)
  • December (4)
  • November (5)
  • October (4)
  • September (4)
  • August (5)
  • July (4)
  • June (4)
  • May (5)
  • April (4)
  • March (5)
  • February (4)
  • January (4)
2023 (54)
  • December (4)
  • November (5)
  • October (5)
  • September (5)
  • August (5)
  • July (5)
  • June (6)
  • May (4)
  • April (5)
  • March (6)
  • February (3)
  • January (1)
2022 (52)
  • December (5)
  • November (4)
  • October (4)
  • September (5)
  • August (4)
  • July (5)
  • June (4)
  • May (4)
  • April (5)
  • March (4)
  • February (4)
  • January (4)
2021 (63)
  • December (5)
  • November (4)
  • October (4)
  • September (5)
  • August (4)
  • July (4)
  • June (3)
  • May (1)
  • April (8)
  • March (9)
  • February (8)
  • January (8)
2020 (57)
  • November (2)
  • October (4)
  • September (4)
  • August (5)
  • July (4)
  • June (5)
  • May (6)
  • April (9)
  • March (9)
  • February (7)
  • January (2)
2019 (34)
  • December (4)
  • November (7)
  • September (1)
  • August (8)
  • July (5)
  • June (1)
  • May (4)
  • February (1)
  • January (3)
2018 (61)
  • December (4)
  • November (10)
  • October (12)
  • September (12)
  • August (11)
  • July (8)
  • June (1)
  • May (1)
  • March (1)
  • February (1)
2017 (28)
  • August (1)
  • June (4)
  • May (4)
  • April (5)
  • March (5)
  • February (5)
  • January (4)
2016 (41)
  • December (4)
  • November (5)
  • October (6)
  • September (7)
  • August (7)
  • May (1)
  • April (4)
  • March (3)
  • February (1)
  • January (3)
2015 (15)
  • December (3)
  • November (1)
  • September (2)
  • August (3)
  • July (1)
  • June (1)
  • May (1)
  • March (1)
  • February (2)
2014 (3)
  • December (1)
  • November (1)
  • October (1)

We use cookies that are necessary to operate this website and to offer you a better experience. By proceeding, you acknowledge that you accept these cookies. To learn more, visit our Privacy Policy.

Subscribe

Keep up to date with the latest School of PE news and current offers.

  • School of PE Logo White
Our Company
  • About Us
  • Contact Us
Partnerships
  • Become an Affiliate
  • Companies Served
  • Corporate
  • Universities
  • Work with Us
Resources
  • Affirm Financing
  • Blog
  • Corporate Terms and Conditions
  • DMCA
  • Engineer in Training
  • Errata
  • FAQs
  • Pass Guarantee Policy
  • Money-Back Guarantee
  • Podcast
  • Return Policy
  • Site Map
Promotions
  • Discounts
  • University Students

Copyright © 2025 Privacy Policy

Copied to clipboard